All posts tagged Rebuild

The Slab gets Prepped!

Although looking at the pictures below, it may seem hard to believe, apparently the new place will be finished ready to move in about 4-5 weeks from now! These guys work fast!!

Below is the toilet/bathroom area showing the new plumbing and bathroom extension on the right. Tricky stuff! The bath sits over the shingle pile on the right. The 3 lots of upright pipes from the left are shower, toilet vanity and bathroom vanity.

IMG_0612

The 4x short pipes below on the right (behind the rubble) are under the hot water cylinder in the hall cupboard.

IMG_0616

Below shows the tweaks to the edges of the slab. To meet the new Fraemohs design style, they had to remove all the inset edges.

IMG_0614IMG_0617

Crash! There goes our house!

As some of you may know, our house was written off through damage caused by the Sept 4th Christchurch earthquake. Thanks to our awesome insurer, Westpac (Lumley), a new house is being built over the next 2 months.

Here’s some good destruction action!

yup-IMG_0383yup-IMG_0377   yup-IMG_0409yup-IMG_0398 yup-IMG_0418 yup-IMG_0423 yup-IMG_0437 yup-IMG_0448 yup-IMG_0452

 

More rebuild pics to come!