The Slab gets Prepped!

Although looking at the pictures below, it may seem hard to believe, apparently the new place will be finished ready to move in about 4-5 weeks from now! These guys work fast!!

Below is the toilet/bathroom area showing the new plumbing and bathroom extension on the right. Tricky stuff! The bath sits over the shingle pile on the right. The 3 lots of upright pipes from the left are shower, toilet vanity and bathroom vanity.

IMG_0612

The 4x short pipes below on the right (behind the rubble) are under the hot water cylinder in the hall cupboard.

IMG_0616

Below shows the tweaks to the edges of the slab. To meet the new Fraemohs design style, they had to remove all the inset edges.

IMG_0614IMG_0617